| DRILLING PROJECT BID SPECS |
| When
do you need this bid? |
Date:
Time:
|
| Is
an ATV or Low Clearance drill needed for any borings on this
project? If so, why? Examples: Rough terrain, overhead power lines, canopy, inside work. |
yes
no
If Yes, how many?
|
| How
many total soil borings and to what depth? |
|
| Sampling
interval for borings and your estimated number of samples? |
|
| Do
you need Shelby tube samples? |
yes
no |
| Will
the drilling be in concrete, gravel, grass or asphalt? |
asphalt
concrete coring
both
none |
| Will
there be rock drilling? |
yes
no
If so, what depth will we hit rock?
|
| Will
these borings be converted to monitoring wells? |
yes
no
If so, what size?
|
| How
many wells and at what depth ? |
|
| How
many feet of screen? |
|
| What
size slot screen? |
|
| Wells
to be completed as: |
Flushmounts or
Procasing |
| Borings
be filled with: |
Soil Cuttings
Bentonite
Chips
Grout Mix |
| Do
you want a decon pad to contain the decon water? Or do you want to utilize a decon trailer? |
yes
no |
| Do
you want to drum the cuttings? |
yes
no |
| Do
you want to drum the decon and development water? |
yes
no |
| Is
water available on site? |
yes
no |
| Do
you want H.A.D. to develop the monitoring wells? |
yes
no |
| Do you want us to Air Knife your borings? If so, to what depth? |
|
| Is this work inside of a building? |
yes
no |
| If so, please answer the following questions: How will we enter the building with our equipment? Is the building occupied? Do we need our vent system? Will this project be completed during normal working hours? Is power and water available to us? |
|